Triple

T24534141
Position Surface form Disambiguated ID Type / Status
Subject Stars in Their Eyes E606897 entity
Predicate closingSequence P124939 FINISHED
Object reveal of audience vote winner LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: reveal of audience vote winner | Statement: [Stars in Their Eyes, closingSequence, reveal of audience vote winner]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: closingSequence
Context triple: [Stars in Their Eyes, closingSequence, reveal of audience vote winner]
  • A. closingSequenceFeature chosen
    Indicates a feature or element that appears specifically in the closing sequence of an event, process, or media item.
  • B. closingSection
    Indicates that one entity serves as the concluding or final section of another entity (such as a document, event, or structured sequence).
  • C. closingPosition
    Indicates that an entity terminates, finalizes, or brings to an end the position or state of another entity.
  • D. closingMotif
    Indicates a recurring element, theme, or pattern that appears at the end of a work or segment, signaling closure or conclusion.
  • E. closureCompleted
    Indicates that a previously initiated closure process or shutdown has been fully and successfully completed.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2c4c90c848190b23c4303620dcaaf completed April 17, 2026, 11:39 p.m.
NER Named-entity recognition batch_69f2be044d4c819094e14eda28d371a7 completed April 30, 2026, 2:27 a.m.
PD Predicate disambiguation batch_69f2a6b0ca8081908d931aec560eae56 completed April 30, 2026, 12:47 a.m.
Created at: April 18, 2026, 2:25 a.m.