Triple

T24524244
Position Surface form Disambiguated ID Type / Status
Subject Singer Model 15 E606621 entity
Predicate constructionQuality P156605 FINISHED
Object heavy‑duty LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: heavy‑duty | Statement: [Singer Model 15, constructionQuality, heavy‑duty]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: constructionQuality
Context triple: [Singer Model 15, constructionQuality, heavy‑duty]
  • A. constructionSupervision
    Indicates that one entity oversees, manages, or inspects the construction activities or process of another entity or project.
  • B. constructionLabor
    Indicates a relationship where an entity performs or provides labor specifically for construction-related work or projects.
  • C. constructionCompleted
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • D. constructionStandard
    Indicates that something is built, designed, or implemented according to a specified construction standard or code.
  • E. constructionType
    Indicates the specific method or style by which something is built or constructed.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2c4c85778819085f5da9af3569ad5 completed April 17, 2026, 11:39 p.m.
NER Named-entity recognition batch_69f2be044d4c819094e14eda28d371a7 completed April 30, 2026, 2:27 a.m.
PD Predicate disambiguation batch_69f2a6b0ca8081908d931aec560eae56 completed April 30, 2026, 12:47 a.m.
PDg Predicate description generation batch_69f2b8b8bc5881908df49c0b07110246 completed April 30, 2026, 2:04 a.m.
Created at: April 18, 2026, 2:25 a.m.