Triple
T24506541
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Stallion |
E618083
|
entity |
| Predicate | requiresManagement |
P84241
|
FINISHED |
| Object | experienced handlers |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: experienced handlers | Statement: [Stallion, requiresManagement, experienced handlers]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: requiresManagement Context triple: [Stallion, requiresManagement, experienced handlers]
-
A.
requiresManagementFor
Indicates that one entity depends on another entity to provide oversight, coordination, or administrative control in order for it to function or be valid.
-
B.
requiresManagementPractice
chosen
Indicates that one entity depends on the application of a specific management practice or intervention to be properly maintained, operated, or effective.
-
C.
requiresManagementBoard
Indicates that something must be overseen, approved, or governed by a management board in order to proceed or be valid.
-
D.
hasManagementNeed
Indicates that an entity requires management, oversight, or intervention to address a particular condition, resource, or situation.
-
E.
requiresInfrastructureManagement
Indicates that one entity depends on another to provide or perform infrastructure management in order for it to function or be fulfilled.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2d7f682108190a1a7ca5fd485ee8a |
completed | April 18, 2026, 1:01 a.m. |
| NER | Named-entity recognition | batch_69f2a9d912e88190bc39c05a9d7f407e |
completed | April 30, 2026, 1:01 a.m. |
| PD | Predicate disambiguation | batch_69f2a6a4580481908fddc385f5262f95 |
completed | April 30, 2026, 12:47 a.m. |
Created at: April 18, 2026, 2:23 a.m.