Triple
T24495722
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 부산 도시철도 2호선 |
E617784
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | 도시철도 노선 |
C641
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: 도시철도 노선 Context triple: [부산 도시철도 2호선, instanceOf, 도시철도 노선]
-
A.
commuter rail line
A commuter rail line is a passenger train service that operates on fixed tracks and schedules to connect suburban or outlying areas with a central city, primarily serving daily work and school commuters.
-
B.
subway line
chosen
A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
-
C.
railway line
A railway line is a fixed transportation route consisting of tracks, signaling, and related infrastructure along which trains operate between defined locations.
-
D.
railroad line
A railroad line is a fixed route consisting of tracks and associated infrastructure over which trains operate to transport passengers or freight between locations.
-
E.
light rail transit line
A light rail transit line is a fixed-route urban or suburban rail corridor using electrically powered, relatively low-capacity trains that operate on dedicated or semi-exclusive tracks to provide frequent, short- to medium-distance passenger service.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2d7f4e6bc8190aec540ae3b9ed7f2 |
completed | April 18, 2026, 1:01 a.m. |
Created at: April 18, 2026, 2:22 a.m.