Triple

T24486472
Position Surface form Disambiguated ID Type / Status
Subject U.S. Route 1 Alternate in Bladensburg E617522 entity
Predicate instanceOf P0 FINISHED
Object special route of U.S. Route 1 C8195 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: special route of U.S. Route 1
Context triple: [U.S. Route 1 Alternate in Bladensburg, instanceOf, special route of U.S. Route 1]
  • A. U.S. Highway business route chosen
    A U.S. Highway business route is a special alignment of a U.S. Highway that diverts from the main route to pass through the downtown or commercial center of a city or town, providing local access to businesses and services.
  • B. auxiliary route of U.S. Route 20
    An auxiliary route of U.S. Route 20 is a supplementary highway, such as a business, bypass, or spur route, that branches from and reconnects to the main U.S. Route 20 to serve specific local or regional traffic needs.
  • C. U.S. Bicycle Route
    A U.S. Bicycle Route is a nationally designated, numbered cycling corridor that connects states, regions, and key destinations across the United States using a mix of on-road and off-road facilities.
  • D. spur route
    A spur route is a short roadway that branches off from a main highway or route to provide direct access to a specific destination or area.
  • E. spur route
    A spur route is a short, secondary road or railway line that branches off from a main route to provide direct access to a specific location or area.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2d7f4e6bc8190aec540ae3b9ed7f2 completed April 18, 2026, 1:01 a.m.
Created at: April 18, 2026, 2:22 a.m.