Triple

T24483439
Position Surface form Disambiguated ID Type / Status
Subject Vårgrønn E617439 entity
Predicate instanceOf P0 FINISHED
Object offshore wind developer C14998 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: offshore wind developer
Context triple: [Vårgrønn, instanceOf, offshore wind developer]
  • A. renewable energy developer chosen
    A renewable energy developer is an entity or professional that identifies, plans, finances, and constructs projects that generate power from sustainable sources such as solar, wind, hydro, or geothermal energy.
  • B. wind power company
    A wind power company is an organization that develops, owns, and operates wind energy projects to generate and sell electricity produced from wind turbines.
  • C. offshore wind licensing round
    An offshore wind licensing round is a formal, competitive process through which a governing authority offers defined seabed areas or rights for the exploration, development, and operation of offshore wind energy projects.
  • D. wind power facility
    A wind power facility is an installation that converts the kinetic energy of wind into electrical energy using one or more wind turbines, along with associated infrastructure for control, transmission, and maintenance.
  • E. offshore drilling contractor
    An offshore drilling contractor is a specialized company that owns and operates offshore drilling rigs and related equipment to explore for and extract oil and gas beneath the seabed on behalf of energy producers.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2d7f3ae788190b683394db15f220e completed April 18, 2026, 1:01 a.m.
Created at: April 18, 2026, 2:21 a.m.