Triple
T24475056
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Basingstoke Canal Authority |
E617210
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | waterway management organization |
C49047
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: waterway management organization Context triple: [Basingstoke Canal Authority, instanceOf, waterway management organization]
-
A.
water management agency
A water management agency is an organization responsible for planning, regulating, and overseeing the sustainable allocation, use, and protection of water resources within a defined region.
-
B.
flood control agency
A flood control agency is an organization responsible for planning, implementing, and managing measures to prevent, mitigate, and respond to flooding in a specific region.
-
C.
river basin organization
A river basin organization is an institutional body responsible for coordinating the management, development, and protection of water and related resources within a defined river basin across sectors and jurisdictions.
-
D.
waterfront management agency
A waterfront management agency is an organization responsible for planning, regulating, and coordinating the sustainable use, development, and protection of coastal and shoreline areas.
-
E.
water management structure
A water management structure is a constructed facility or system designed to control, store, convey, or regulate the quantity and movement of water in natural or built environments.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2d7f197588190889a03e620558059 |
completed | April 18, 2026, 1:01 a.m. |
Created at: April 18, 2026, 2:20 a.m.