Triple

T24443179
Position Surface form Disambiguated ID Type / Status
Subject Guilford station E616323 entity
Predicate electrifiedLine P73384 FINISHED
Object Northeast Corridor NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Northeast Corridor | Statement: [Guilford station, electrifiedLine, Northeast Corridor]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: electrifiedLine
Context triple: [Guilford station, electrifiedLine, Northeast Corridor]
  • A. numberOfElectrifiedLines
    Indicates the quantity of railway or transit lines within a system or network that are equipped with electrical power infrastructure for operation.
  • B. railElectrificationIncludes
    Indicates that a rail electrification system or project encompasses, covers, or incorporates a specified segment, component, or area of railway infrastructure.
  • C. electrificationTerminusOf
    Indicates that a location or point serves as the end of an electrified section of a route, line, or network.
  • D. electrifiedAlongMostOfRoute
    Indicates that the route is equipped with electric power infrastructure along the majority of its length, but not necessarily its entirety.
  • E. isElectrifiedSectionOf chosen
    Indicates that one section or segment is a part of a larger entity and has been equipped with electrical power or electrification.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2d7edca608190aafefc8877a1b4da completed April 18, 2026, 1:01 a.m.
NER Named-entity recognition batch_69f2985129cc8190b5c99747d2dbcac8 completed April 29, 2026, 11:46 p.m.
PD Predicate disambiguation batch_69f287d3237c819099559c00f83131d8 completed April 29, 2026, 10:36 p.m.
Created at: April 18, 2026, 2:17 a.m.