Triple
T24423930
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Führer decree of 1944 |
E615802
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | World War II directive |
C48985
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: World War II directive Context triple: [Führer decree of 1944, instanceOf, World War II directive]
-
A.
World War II military plan
A World War II military plan is a strategically designed, time-bound set of coordinated operations and resource allocations intended to achieve specific political and military objectives within the context of the global conflict.
-
B.
World War II campaign
A World War II campaign is a coordinated series of military operations conducted over a specific period and geographic area, aimed at achieving strategic objectives within the broader context of the war.
-
C.
World War II project
A World War II project is a structured investigation or creative work that explores specific aspects of the Second World War—such as events, people, technology, or impacts—using historical sources to analyze and present findings.
-
D.
World War II home front initiative
A World War II home front initiative is a coordinated civilian effort, organized by governments or communities, to support the war through activities such as resource conservation, industrial production, volunteer work, and morale-building campaigns.
-
E.
World War II offensive
A World War II offensive is a coordinated, large-scale military campaign conducted by one or more nations to seize strategic objectives, weaken enemy forces, or shift the balance of the war in a specific theater or front.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2d7eadb248190a867130fe45f0388 |
completed | April 18, 2026, 1:01 a.m. |
Created at: April 18, 2026, 2:14 a.m.