Triple

T24423930
Position Surface form Disambiguated ID Type / Status
Subject Führer decree of 1944 E615802 entity
Predicate instanceOf P0 FINISHED
Object World War II directive C48985 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: World War II directive
Context triple: [Führer decree of 1944, instanceOf, World War II directive]
  • A. World War II military plan
    A World War II military plan is a strategically designed, time-bound set of coordinated operations and resource allocations intended to achieve specific political and military objectives within the context of the global conflict.
  • B. World War II campaign
    A World War II campaign is a coordinated series of military operations conducted over a specific period and geographic area, aimed at achieving strategic objectives within the broader context of the war.
  • C. World War II project
    A World War II project is a structured investigation or creative work that explores specific aspects of the Second World War—such as events, people, technology, or impacts—using historical sources to analyze and present findings.
  • D. World War II home front initiative
    A World War II home front initiative is a coordinated civilian effort, organized by governments or communities, to support the war through activities such as resource conservation, industrial production, volunteer work, and morale-building campaigns.
  • E. World War II offensive
    A World War II offensive is a coordinated, large-scale military campaign conducted by one or more nations to seize strategic objectives, weaken enemy forces, or shift the balance of the war in a specific theater or front.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2d7eadb248190a867130fe45f0388 completed April 18, 2026, 1:01 a.m.
Created at: April 18, 2026, 2:14 a.m.