Triple
T24420655
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Baltic power grid |
E615714
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | synchronous power system |
C7916
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: synchronous power system Context triple: [Baltic power grid, instanceOf, synchronous power system]
-
A.
power system
chosen
A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
-
B.
balance of power system
A balance of power system is an international relations arrangement in which states form shifting alliances and counterweights so that no single actor becomes dominant enough to threaten the independence or security of the others.
-
C.
electric power station
An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
-
D.
electric motor
An electric motor is a device that converts electrical energy into mechanical rotational energy through the interaction of magnetic fields and current-carrying conductors.
-
E.
hydroelectric power complex
A hydroelectric power complex is an integrated facility that harnesses the energy of flowing or falling water—using dams, reservoirs, turbines, and generators—to produce and distribute electrical power.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2d7e9bfac8190a748952a90957106 |
completed | April 18, 2026, 1:01 a.m. |
Created at: April 18, 2026, 2:14 a.m.