Triple

T24387415
Position Surface form Disambiguated ID Type / Status
Subject Trinity Bridge E614785 entity
Predicate instanceOf P0 FINISHED
Object three-way bridge C48411 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: three-way bridge
Context triple: [Trinity Bridge, instanceOf, three-way bridge]
  • A. bridge approach
    A bridge approach is the section of roadway that transitions between the ground and the main span of a bridge, providing a smooth and stable connection for vehicles and pedestrians.
  • B. private bridge
    A private bridge is a non-publicly owned structure that spans a physical obstacle, such as a river or road, to provide controlled access exclusively for specific individuals, properties, or organizations.
  • C. public transport bridge
    A public transport bridge is a dedicated crossing structure designed primarily for buses, trams, trains, or other mass transit vehicles to traverse obstacles such as rivers, roads, or valleys efficiently and safely.
  • D. bridge operator
    A bridge operator is an entity responsible for managing and controlling the operation, safety, and coordination of a bridge’s movable or functional components to ensure efficient and secure passage for users.
  • E. causeway-style bridge
    A causeway-style bridge is a low, often long roadway structure built across water, wetlands, or low-lying terrain, typically supported by embankments or short spans rather than tall piers.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2d7e362e481909e32fe4ef8269d4f completed April 18, 2026, 1:01 a.m.
Created at: April 18, 2026, 2:03 a.m.