Triple

T24382694
Position Surface form Disambiguated ID Type / Status
Subject J. J. and W. M. Biner E614654 entity
Predicate instanceOf P0 FINISHED
Object mountaineering partnership C48406 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: mountaineering partnership
Context triple: [J. J. and W. M. Biner, instanceOf, mountaineering partnership]
  • A. mountaineering club
    A mountaineering club is an organized group of individuals who share resources, training, and coordinated activities to safely plan and undertake climbing and high-altitude expeditions.
  • B. mountaineering expedition
    A mountaineering expedition is an organized journey by a team to plan, approach, and ascend challenging mountain terrain, managing technical, environmental, and logistical risks to reach specific climbing objectives.
  • C. mountaineering feature
    A mountaineering feature is any distinct natural or artificial element of mountainous terrain—such as ridges, faces, couloirs, or fixed anchors—that significantly influences route selection, difficulty, and safety in climbing and alpine travel.
  • D. mountaineer
    A mountaineer is an individual who climbs mountains, often using specialized skills and equipment to navigate challenging and high-altitude terrain.
  • E. mountaineering periodical
    A mountaineering periodical is a regularly published magazine or journal that focuses on climbing, alpine exploration, mountain culture, and related news, techniques, and stories.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2d7e362e481909e32fe4ef8269d4f completed April 18, 2026, 1:01 a.m.
Created at: April 18, 2026, 2:03 a.m.