Triple

T2437363
Position Surface form Disambiguated ID Type / Status
Subject Boulder, Colorado E53190 entity
Predicate majorRiver P165 FINISHED
Object Boulder Creek E410650 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Boulder Creek | Statement: [Boulder, Colorado, majorRiver, Boulder Creek]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Boulder Creek
Context triple: [Boulder, Colorado, majorRiver, Boulder Creek]
  • A. Boulder Creek chosen
    Boulder Creek is a scenic mountain stream in Boulder, Colorado, popular for recreation such as tubing, fishing, and walking along its adjacent paths.
  • B. Fountain Creek
    Fountain Creek is a stream in southeastern Colorado that flows through the Colorado Springs–Pueblo area before joining the Arkansas River.
  • C. Tenaya Creek
    Tenaya Creek is a mountain stream in Yosemite National Park that drains Tenaya Canyon and flows into the Merced River.
  • D. Coyote Creek
    Coyote Creek is a themed western-style area within the Six Flags America amusement park featuring rides, attractions, and frontier-inspired decor.
  • E. Coyote Creek
    Coyote Creek is a major stream in Northern California that flows through Santa Clara County, including the city of San Jose, and serves as an important natural waterway and habitat corridor in the region.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab495b6dac8190ac82661aa1452222 completed March 6, 2026, 9:38 p.m.
NER Named-entity recognition batch_69abc9f342e88190a430b02842ded418 completed March 7, 2026, 6:47 a.m.
NED1 Entity disambiguation (via context triple) batch_69b56b217af0819084d8aed695b8377b completed March 14, 2026, 2:05 p.m.
Created at: March 6, 2026, 9:43 p.m.