Triple

T2436529
Position Surface form Disambiguated ID Type / Status
Subject Teesta River E52973 entity
Predicate hasDam P8736 FINISHED
Object Teesta Low Dam III
Teesta Low Dam III is a hydroelectric power project built on the Teesta River in India to generate electricity and help regulate river flow.
E265913 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Teesta Low Dam III | Statement: [Teesta River, hasDam, Teesta Low Dam III]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Teesta Low Dam III
Context triple: [Teesta River, hasDam, Teesta Low Dam III]
  • A. Ralco Dam
    Ralco Dam is a major hydroelectric power plant in Chile, known for its large reservoir and controversial impact on the local environment and indigenous communities.
  • B. Navilatirtha Dam
    Navilatirtha Dam is a major irrigation and water management structure built across the Malaprabha River in Karnataka, India.
  • C. Narayanpur Dam
    Narayanpur Dam is a major irrigation and hydroelectric structure built across the Krishna River in Karnataka, India.
  • D. Rawal Dam
    Rawal Dam is a water reservoir structure near Islamabad, Pakistan, built to store and supply water from Rawal Lake for the surrounding region.
  • E. Bhima Dam
    Bhima Dam is a major irrigation and water management structure built across the Bhima River in India.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Teesta Low Dam III
Triple: [Teesta River, hasDam, Teesta Low Dam III]
Generated description
Teesta Low Dam III is a hydroelectric power project built on the Teesta River in India to generate electricity and help regulate river flow.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Teesta Low Dam III
Target entity description: Teesta Low Dam III is a hydroelectric power project built on the Teesta River in India to generate electricity and help regulate river flow.
  • A. Ralco Dam
    Ralco Dam is a major hydroelectric power plant in Chile, known for its large reservoir and controversial impact on the local environment and indigenous communities.
  • B. Navilatirtha Dam
    Navilatirtha Dam is a major irrigation and water management structure built across the Malaprabha River in Karnataka, India.
  • C. Narayanpur Dam
    Narayanpur Dam is a major irrigation and hydroelectric structure built across the Krishna River in Karnataka, India.
  • D. Rawal Dam
    Rawal Dam is a water reservoir structure near Islamabad, Pakistan, built to store and supply water from Rawal Lake for the surrounding region.
  • E. Bhima Dam
    Bhima Dam is a major irrigation and water management structure built across the Bhima River in India.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4959bcc0819083246f9fb10439e3 completed March 6, 2026, 9:38 p.m.
NER Named-entity recognition batch_69abc9cd49b48190bff10a5ab7cef483 completed March 7, 2026, 6:46 a.m.
NED1 Entity disambiguation (via context triple) batch_69aebf7085b88190938c4eefa4380970 completed March 9, 2026, 12:39 p.m.
NEDg Description generation batch_69aec30189d081908bb6865937aff20d completed March 9, 2026, 12:54 p.m.
NED2 Entity disambiguation (via description) batch_69aec39bb6a4819084652814e18f60d4 completed March 9, 2026, 12:56 p.m.
Created at: March 6, 2026, 9:43 p.m.