Triple

T24306674
Position Surface form Disambiguated ID Type / Status
Subject Coast Division E612553 entity
Predicate instanceOf P0 FINISHED
Object electrified railway line segment C3787 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: electrified railway line segment
Context triple: [Coast Division, instanceOf, electrified railway line segment]
  • A. electrified railway
    An electrified railway is a rail transport system in which trains receive power from external electrical sources, such as overhead lines or third rails, instead of relying on onboard fuel.
  • B. railway line chosen
    A railway line is a fixed transportation route consisting of tracks, signaling, and related infrastructure along which trains operate between defined locations.
  • C. electrified railway operation
    Electrified railway operation is the management and control of train services powered by electrical energy supplied through overhead lines or third rails, encompassing infrastructure, rolling stock, power systems, and operational procedures to ensure safe, efficient, and reliable transport.
  • D. third rail electrification system
    A third rail electrification system is a method of providing electric power to trains via an additional rail mounted alongside or between the running rails, from which current is collected by contact shoes on the train.
  • E. railroad line
    A railroad line is a fixed route consisting of tracks and associated infrastructure over which trains operate to transport passengers or freight between locations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2d7d91bb48190bc5377d17a85fb21 completed April 18, 2026, 1:01 a.m.
Created at: April 18, 2026, 1:31 a.m.