Triple

T2429551
Position Surface form Disambiguated ID Type / Status
Subject Marine Corps Installations Pacific E52809 entity
Predicate instanceOf P0 FINISHED
Object regional installation management command C1183 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: regional installation management command
Context triple: [Marine Corps Installations Pacific, instanceOf, regional installation management command]
  • A. software package manager
    A software package manager is a tool that automates the discovery, installation, updating, configuration, and removal of software packages and their dependencies in a consistent and reliable way.
  • B. configuration management framework
    A configuration management framework is a system that automates the definition, deployment, and ongoing enforcement of desired configurations across infrastructure and applications in a consistent, repeatable way.
  • C. regional administrative branch chosen
    A regional administrative branch is a localized division of a larger organization or government responsible for managing operations, implementing policies, and coordinating services within a specific geographic area.
  • D. branch-level command
    A branch-level command is an instruction or directive executed within the context of a specific branch (such as in version control or organizational hierarchy), affecting only that branch’s state, behavior, or data.
  • E. cobbler
    A cobbler is a skilled craftsperson who repairs, maintains, and sometimes makes shoes and other leather footwear.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4959bcc0819083246f9fb10439e3 completed March 6, 2026, 9:38 p.m.
Created at: March 6, 2026, 9:43 p.m.