Triple
T24291733
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Shoreham Tollbridge |
E605840
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | former toll bridge |
C3385
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: former toll bridge Context triple: [Shoreham Tollbridge, instanceOf, former toll bridge]
-
A.
former bridge
A former bridge is a structure that once functioned as a crossing over an obstacle such as water, a road, or a valley, but has since been decommissioned, repurposed, or rendered unusable for its original bridging purpose.
-
B.
former railway bridge
A former railway bridge is a decommissioned rail-carrying structure that once supported train traffic but is now unused, repurposed, or preserved for other functions such as pedestrian or cycle paths.
-
C.
toll bridge
chosen
A toll bridge is a bridge where users must pay a fee to cross, typically to fund its construction, maintenance, or operation.
-
D.
ancient bridge
An ancient bridge is a historically significant structure built in antiquity to span a physical obstacle such as a river or valley, often showcasing the engineering techniques, materials, and cultural aesthetics of its era.
-
E.
historic gateway and bridge
A historic gateway and bridge is an architectural structure that combines a monumental entrance passage with a spanning construction over a physical obstacle, often serving both defensive and ceremonial functions while facilitating transit.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e29549335881909cbf27adcaba1cf0 |
completed | April 17, 2026, 8:17 p.m. |
Created at: April 18, 2026, 12:09 a.m.