Triple
T24285600
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Gōruden Wīku |
E605661
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Japanese national holiday period |
C289
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Japanese national holiday period Context triple: [Gōruden Wīku, instanceOf, Japanese national holiday period]
-
A.
national holiday
chosen
A national holiday is a legally recognized day of celebration or commemoration on which a nation collectively observes significant historical, cultural, or religious events, often with reduced work and school obligations.
-
B.
public holiday
A public holiday is a legally designated day on which work and school are generally suspended to allow the population to observe cultural, historical, religious, or national events.
-
C.
日本の国家行事
日本の国家行事は、憲法や法律、慣習などに基づき、国家としての重要な儀礼・記念・祝祭を公的に執り行う行事の総称である。
-
D.
Japanese rite of passage
A Japanese rite of passage is a culturally significant ceremony or practice that marks a major transition in an individual’s life, such as birth, coming of age, marriage, or entering old age, often blending Shinto, Buddhist, and secular traditions.
-
E.
holiday standard
A holiday standard is a widely recognized and repeatedly celebrated song, film, or tradition that recurs each holiday season and is culturally regarded as timeless.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e295480d0c8190846fc3c2e2da1d4c |
completed | April 17, 2026, 8:17 p.m. |
Created at: April 18, 2026, 12:08 a.m.