Triple

T24281124
Position Surface form Disambiguated ID Type / Status
Subject water level management of Sayeon Dam E605542 entity
Predicate instanceOf P0 FINISHED
Object reservoir operation policy C17346 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: reservoir operation policy
Context triple: [water level management of Sayeon Dam, instanceOf, reservoir operation policy]
  • A. water management policy decision chosen
    A water management policy decision is a deliberate choice by authorities or stakeholders that sets rules, priorities, and actions for allocating, conserving, and protecting water resources to balance environmental, social, and economic needs.
  • B. hydropower operations division
    The hydropower operations division oversees the planning, control, and maintenance of hydroelectric facilities to ensure safe, efficient, and reliable power generation from water resources.
  • C. reservoir dam
    A reservoir dam is a large engineered barrier built across a watercourse to store and regulate water in an upstream reservoir for purposes such as water supply, flood control, irrigation, and power generation.
  • D. river basin management plan
    A river basin management plan is a strategic framework that outlines coordinated actions, policies, and measures to sustainably manage water resources, ecosystems, land use, and human activities within a defined river basin.
  • E. water management project
    A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e295480d0c8190846fc3c2e2da1d4c completed April 17, 2026, 8:17 p.m.
Created at: April 18, 2026, 12:08 a.m.