Triple

T2426391
Position Surface form Disambiguated ID Type / Status
Subject Jones Street and Beach Street E53537 entity
Predicate partOfTransitNetwork P8428 FINISHED
Object San Francisco Municipal Railway E23810 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: San Francisco Municipal Railway | Statement: [Jones Street and Beach Street, partOfTransitNetwork, San Francisco Municipal Railway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: San Francisco Municipal Railway
Context triple: [Jones Street and Beach Street, partOfTransitNetwork, San Francisco Municipal Railway]
  • A. San Francisco Muni chosen
    San Francisco Muni is the primary public transportation system in San Francisco, operating the city’s network of buses, light rail, historic streetcars, and cable cars.
  • B. San Francisco Bay Area Rapid Transit District
    The San Francisco Bay Area Rapid Transit District is the public agency that plans, funds, and oversees the Bay Area’s regional BART rail transit system.
  • C. San Francisco Municipal Transportation Agency
    The San Francisco Municipal Transportation Agency is the city department responsible for managing and operating San Francisco’s public transit, parking, traffic, and street infrastructure.
  • D. BART
    BART (Bay Area Rapid Transit) is a major rapid transit system serving the San Francisco Bay Area, linking cities like San Francisco, Oakland, and Berkeley with surrounding suburbs and regional transit networks.
  • E. San Francisco County Transportation Authority
    The San Francisco County Transportation Authority is the county’s transportation planning and funding agency, responsible for developing and overseeing major transit, roadway, and mobility projects in San Francisco.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: partOfTransitNetwork
Context triple: [Jones Street and Beach Street, partOfTransitNetwork, San Francisco Municipal Railway]
  • A. partOfTransitSystem chosen
    Indicates that something is a component or segment within a larger transit or transportation system.
  • B. appliesToTransitSystem
    Indicates that something (such as a rule, policy, feature, or condition) is relevant or applicable to a particular transit or transportation system.
  • C. servesAsThroughStationFor
    Indicates that a station functions as an intermediate (through) stop for a particular service, route, or journey rather than as its starting or ending point.
  • D. appliesToTransitLine
    Indicates that a rule, condition, or characteristic is specifically associated with and relevant to a particular transit line.
  • E. subwayLine
    Indicates that there is a subway line connection or service relationship between the referenced entities.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab495c44d48190b7235b23719bc3f6 completed March 6, 2026, 9:38 p.m.
NER Named-entity recognition batch_69abc9f342e88190a430b02842ded418 completed March 7, 2026, 6:47 a.m.
NED1 Entity disambiguation (via context triple) batch_69af2b72fa288190846e4e68b912c7dc completed March 9, 2026, 8:20 p.m.
PD Predicate disambiguation batch_69abc5a889948190b77de4ef6ac815a8 completed March 7, 2026, 6:28 a.m.
Created at: March 6, 2026, 9:42 p.m.