Triple

T24261551
Position Surface form Disambiguated ID Type / Status
Subject Nurek Dam E604716 entity
Predicate plantCommissioningEnd P152456 FINISHED
Object 1979 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1979 | Statement: [Nurek Dam, plantCommissioningEnd, 1979]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plantCommissioningEnd
Context triple: [Nurek Dam, plantCommissioningEnd, 1979]
  • A. commissioningEndDate
    Indicates the date on which the commissioning process or commissioning-related responsibilities are completed or terminated.
  • B. commissioningEndYear chosen
    Indicates the calendar year in which the commissioning or initial operational phase of something is completed or ends.
  • C. constructionStatusAtCommissioning
    Indicates the state or phase of construction an asset or structure was in at the time it was officially commissioned.
  • D. deploymentEnd
    Indicates the point in time or event at which a deployment process or deployment state comes to an end.
  • E. commissioningUpon
    Indicates that one entity formally authorizes, initiates, or assigns another entity to begin a specific role, task, or project.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e29544c29c8190b023606eafe5d36a completed April 17, 2026, 8:17 p.m.
NER Named-entity recognition batch_69f28c6727388190862e3ce09c372c70 completed April 29, 2026, 10:55 p.m.
PD Predicate disambiguation batch_69f1c450aa508190bc9d372a5f6ee47a completed April 29, 2026, 8:41 a.m.
Created at: April 18, 2026, 12:06 a.m.