Triple

T24228993
Position Surface form Disambiguated ID Type / Status
Subject Saint-André-d’Argenteuil E601673 entity
Predicate hasNearbyHydroelectricInfrastructure P144900 FINISHED
Object Carillon hydroelectric complex NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Carillon hydroelectric complex | Statement: [Saint-André-d’Argenteuil, hasNearbyHydroelectricInfrastructure, Carillon hydroelectric complex]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasNearbyHydroelectricInfrastructure
Context triple: [Saint-André-d’Argenteuil, hasNearbyHydroelectricInfrastructure, Carillon hydroelectric complex]
  • A. hasHydroelectricInfrastructureNearby chosen
    Indicates that there is hydroelectric infrastructure located in close proximity to the referenced entity.
  • B. hasHydropowerRoleIn
    Indicates that an entity plays a specific role or function related to hydropower within the context of another entity, project, or activity.
  • C. hasHydroelectricProject
    Indicates that an entity is associated with, operates, or contains a hydroelectric power generation project.
  • D. isHydroelectricallyDeveloped
    Indicates that an entity has been developed to generate electricity using hydropower infrastructure or facilities.
  • E. isHydroelectricProjectOn
    Indicates that a hydroelectric project is located on or situated along a specified water body or site.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e29538aafc8190a2386fdebbd1393b completed April 17, 2026, 8:16 p.m.
NER Named-entity recognition batch_69f287e214e88190bf6d5b0f5f489f73 completed April 29, 2026, 10:36 p.m.
PD Predicate disambiguation batch_69f1c448abec8190b87cbf9ed419a309 completed April 29, 2026, 8:41 a.m.
Created at: April 18, 2026, 12:01 a.m.