Triple

T24188917
Position Surface form Disambiguated ID Type / Status
Subject Downbeach Express E599638 entity
Predicate instanceOf P0 FINISHED
Object toll causeway C3385 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: toll causeway
Context triple: [Downbeach Express, instanceOf, toll causeway]
  • A. toll road
    A toll road is a roadway for which drivers must pay a fee, typically at designated points or electronically, to use its infrastructure.
  • B. toll highway
    A toll highway is a high-speed road where drivers must pay a fee, typically at toll booths or electronically, to use the roadway for travel.
  • C. toll bridge chosen
    A toll bridge is a bridge where users must pay a fee to cross, typically to fund its construction, maintenance, or operation.
  • D. toll bridge system
    A toll bridge system is a coordinated set of hardware, software, and procedures that manages vehicle identification, fee calculation, payment processing, and access control for crossing a bridge.
  • E. toll road project
    A toll road project is a transportation infrastructure initiative that plans, finances, constructs, and operates a roadway funded primarily through user fees collected from vehicles using the road.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e288cdc8b88190bf2f835d3cb4ca28 completed April 17, 2026, 7:23 p.m.
Created at: April 17, 2026, 11:35 p.m.