Triple
T24178761
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Aglantzia campus |
E599357
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | facility complex |
C21395
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: facility complex Context triple: [Aglantzia campus, instanceOf, facility complex]
-
A.
facility
A facility is a physical place or infrastructure designed and equipped to support specific activities, services, or operations.
-
B.
institutional building complex
chosen
An institutional building complex is a coordinated group of structures and shared spaces designed to support the functions, services, and administration of an organization such as a university, hospital, or government entity.
-
C.
multi-purpose facility
A multi-purpose facility is a versatile building or space designed to support a wide range of activities, events, and functions through adaptable layouts and shared resources.
-
D.
infrastructure facility
An infrastructure facility is a physical installation or complex that provides essential services or support functions—such as transportation, utilities, communication, or public safety—necessary for the operation and development of a community or region.
-
E.
civic building complex
A civic building complex is a coordinated group of public structures and spaces designed to house governmental, administrative, and community services within a unified physical setting.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e288cca05481908faeb1563711114a |
completed | April 17, 2026, 7:23 p.m. |
Created at: April 17, 2026, 11:34 p.m.