Triple

T24166655
Position Surface form Disambiguated ID Type / Status
Subject L2 at Parc Logístic E599005 entity
Predicate instanceOf P0 FINISHED
Object planned metro station C48325 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned metro station
Context triple: [L2 at Parc Logístic, instanceOf, planned metro station]
  • A. future railway station
    A future railway station is a conceptual transportation hub designed with advanced technologies, sustainable infrastructure, and adaptable spaces to efficiently manage high-capacity, multimodal passenger and freight flows.
  • B. tram station
    A tram station is a designated stopping place along a tram line where passengers can safely board, alight, and sometimes transfer between tram services.
  • C. light-rail station
    A light-rail station is a designated facility where light-rail vehicles stop to allow passengers to board, alight, and transfer between services, typically featuring platforms, shelters, signage, and ticketing amenities.
  • D. planned transit corridor
    A planned transit corridor is a designated route or area reserved for future development of public transportation infrastructure, such as bus rapid transit or rail lines, to guide growth and improve regional mobility.
  • E. subway station area
    The subway station area is the spatial zone encompassing the station entrances, platforms, circulation paths, and adjacent public spaces where passengers access, wait for, and transfer between subway services.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e288cbd62881909de32ca64a70c17b completed April 17, 2026, 7:23 p.m.
Created at: April 17, 2026, 11:32 p.m.