Triple
T24150720
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Agni-I |
E598524
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | road-mobile missile |
C26571
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: road-mobile missile Context triple: [Agni-I, instanceOf, road-mobile missile]
-
A.
road-mobile missile system
chosen
A road-mobile missile system is a transportable weapons platform mounted on wheeled or tracked vehicles that can move, deploy, and launch missiles from various locations to enhance survivability and operational flexibility.
-
B.
land-attack missile
A land-attack missile is a guided weapon system designed to strike targets on the ground from long or short range, typically using precision navigation and various warhead types.
-
C.
surface-to-surface missile
A surface-to-surface missile is a guided weapon launched from land or sea platforms designed to strike targets located on the Earth's surface.
-
D.
cruise missile
A cruise missile is a guided, self-propelled weapon that flies at low altitude along a pre-programmed path to deliver a precise payload to a distant target.
-
E.
long-range land-attack missile
A long-range land-attack missile is a guided weapon system designed to strike fixed or relocatable targets deep inland from significant stand-off distances, typically launched from air, sea, or ground platforms.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e288c9e488819093dd1acd91b08b8a |
completed | April 17, 2026, 7:23 p.m. |
Created at: April 17, 2026, 11:30 p.m.