Triple

T24117105
Position Surface form Disambiguated ID Type / Status
Subject St. Louis Union Station E597545 entity
Predicate trainServiceEnded P27833 FINISHED
Object 1978 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1978 | Statement: [St. Louis Union Station, trainServiceEnded, 1978]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: trainServiceEnded
Context triple: [St. Louis Union Station, trainServiceEnded, 1978]
  • A. railServiceEnded chosen
    Indicates that a previously operating rail service has been discontinued or terminated.
  • B. rideOperationEnded
    Indicates that the operation or running state of a ride has come to an end.
  • C. ferryServiceEnded
    Indicates that a previously operating ferry service between locations has been discontinued or terminated.
  • D. serviceResumedAsAmtrakTerminus
    Indicates that train service has been restarted at a station, with that station now functioning as the endpoint (terminus) for Amtrak operations on the route.
  • E. servedByNamedTrain
    Indicates that a service, route, or journey is operated specifically by a train with a particular designated name.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e288c74200819098ab875b592cb39f completed April 17, 2026, 7:23 p.m.
NER Named-entity recognition batch_69f1dedf824081908de34db4ced62c13 completed April 29, 2026, 10:35 a.m.
PD Predicate disambiguation batch_69f17651458c8190bbfd301883e46085 completed April 29, 2026, 3:09 a.m.
Created at: April 17, 2026, 11:04 p.m.