Triple

T24052186
Position Surface form Disambiguated ID Type / Status
Subject Kennedy Bridge (Bonn) E595690 entity
Predicate instanceOf P0 FINISHED
Object Rhine bridge C22181 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Rhine bridge
Context triple: [Kennedy Bridge (Bonn), instanceOf, Rhine bridge]
  • A. bridge over the Main
    A bridge over the Main is a structural crossing that spans the Main River to connect its opposite banks for transportation and passage.
  • B. Seine bridge
    A Seine bridge is a structure that spans the River Seine, providing a crossing for pedestrians, vehicles, or trains while often serving as an architectural and cultural landmark within its urban setting.
  • C. river bridge chosen
    A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
  • D. Ottoman bridge
    An Ottoman bridge is a stone or masonry arch bridge built during the Ottoman Empire, typically featuring elegant arches, narrow decks, and often serving as both a transportation route and a social or commercial gathering space.
  • E. 교량
    교량은 도로나 철도, 보행로 등이 강, 계곡, 도로 등 장애물을 안전하고 효율적으로 횡단할 수 있도록 상부구조와 하부구조로 이루어진 구조물이다.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e288c184b081909f1f1751fb8e299a completed April 17, 2026, 7:23 p.m.
Created at: April 17, 2026, 10:21 p.m.