Triple
T24049843
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | MD-ScM program |
E595624
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | dual-degree academic program |
C2392
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: dual-degree academic program Context triple: [MD-ScM program, instanceOf, dual-degree academic program]
-
A.
interdisciplinary program
An interdisciplinary program is an academic course of study that integrates methods, perspectives, and content from multiple disciplines to address complex questions or problems that cannot be fully understood through a single field alone.
-
B.
academic program
chosen
An academic program is a structured set of courses, requirements, and learning experiences offered by an educational institution that leads to a specific credential, such as a degree, diploma, or certificate.
-
C.
graduate program
A graduate program is an advanced course of study beyond the bachelor’s degree that provides specialized education, training, and research opportunities leading to a master’s or doctoral degree or professional qualification.
-
D.
graduate degree
A graduate degree is an advanced academic qualification pursued after completing a bachelor's degree, focusing on specialized knowledge and research or professional skills in a particular field.
-
E.
engineering degree program
An engineering degree program is a structured course of study at a college or university that combines mathematics, science, and applied engineering principles to prepare students for professional engineering practice in a specific discipline.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e288c184b081909f1f1751fb8e299a |
completed | April 17, 2026, 7:23 p.m. |
Created at: April 17, 2026, 10:19 p.m.