Triple

T24048467
Position Surface form Disambiguated ID Type / Status
Subject Stadler Valencia E595587 entity
Predicate instanceOf P0 FINISHED
Object rail vehicle manufacturing facility C6408 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: rail vehicle manufacturing facility
Context triple: [Stadler Valencia, instanceOf, rail vehicle manufacturing facility]
  • A. rail transport manufacturer
    A rail transport manufacturer is a company that designs, engineers, and produces railway vehicles and related equipment such as locomotives, passenger cars, freight wagons, and signaling systems.
  • B. rail vehicle
    A rail vehicle is a wheeled conveyance designed to operate on railway tracks for transporting passengers, freight, or performing specialized rail-related tasks.
  • C. rolling stock manufacturer chosen
    A rolling stock manufacturer is a company that designs, builds, and often maintains railway vehicles such as locomotives, passenger coaches, and freight wagons.
  • D. railroad facility
    A railroad facility is a dedicated site or complex that supports the operation, maintenance, management, or interchange of trains and rail infrastructure.
  • E. light rail operations facility
    A light rail operations facility is a specialized complex where light rail vehicles are stored, maintained, dispatched, and managed to support safe and efficient transit service.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e288c06a908190899cad4531f32c9a completed April 17, 2026, 7:23 p.m.
Created at: April 17, 2026, 10:18 p.m.