Triple

T2403657
Position Surface form Disambiguated ID Type / Status
Subject USB 3.2 E50224 entity
Predicate standardizedBy P1371 FINISHED
Object USB-IF E6425 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: USB-IF | Statement: [USB 3.2, standardizedBy, USB-IF]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: USB-IF
Context triple: [USB 3.2, standardizedBy, USB-IF]
  • A. USB Implementers Forum chosen
    The USB Implementers Forum is a non-profit industry consortium that develops, maintains, and promotes USB specifications and compliance programs for hardware and software manufacturers.
  • B. USB
    USB (Universal Serial Bus) is a widely adopted industry standard for cables, connectors, and communication protocols used to connect, power, and transfer data between computers and electronic devices.
  • C. USB4
    USB4 is a high-speed, next-generation USB standard that unifies data, video, and power delivery over a single USB-C connector, based on Thunderbolt 3 technology.
  • D. USB 3.2
    USB 3.2 is a high-speed Universal Serial Bus standard that significantly increases data transfer rates and improves performance and efficiency over earlier USB versions.
  • E. USBR
    USBR is the United States Bureau of Reclamation, a federal agency responsible for managing water resources and operating dams, power plants, and irrigation projects in the American West.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88b0339a88190a1207333cd271cc9 completed March 4, 2026, 7:41 p.m.
NER Named-entity recognition batch_69abc8f8aa2881909192920ee394f0b3 completed March 7, 2026, 6:43 a.m.
NED1 Entity disambiguation (via context triple) batch_69aeb3e740c88190872aa1a7834d73b0 completed March 9, 2026, 11:49 a.m.
Created at: March 4, 2026, 7:58 p.m.