Triple
T24019572
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | The Bellevue Collection |
E594778
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | shopping center complex |
C1524
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: shopping center complex Context triple: [The Bellevue Collection, instanceOf, shopping center complex]
-
A.
shopping centre
chosen
A shopping centre is a large complex of retail stores, services, and often entertainment facilities planned and managed as a single commercial property.
-
B.
shopping mall
A shopping mall is a large, often enclosed commercial complex that houses multiple retail stores, dining options, and services connected by shared walkways and common areas.
-
C.
commercial and residential complex
A commercial and residential complex is a mixed-use development that integrates living spaces with retail, office, and service facilities within a unified property or group of buildings.
-
D.
urban plaza
An urban plaza is a publicly accessible open space within a city, typically surrounded by buildings and streets, designed to support social interaction, circulation, and civic activities.
-
E.
civic building complex
A civic building complex is a coordinated group of public structures and spaces designed to house governmental, administrative, and community services within a unified physical setting.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e288be2c288190a3a46006945557f7 |
completed | April 17, 2026, 7:23 p.m. |
Created at: April 17, 2026, 9:42 p.m.