Triple

T24014264
Position Surface form Disambiguated ID Type / Status
Subject sun-and-planet gear E594625 entity
Predicate instanceOf P0 FINISHED
Object mechanical gearing system C48793 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: mechanical gearing system
Context triple: [sun-and-planet gear, instanceOf, mechanical gearing system]
  • A. clock mechanism
    A clock mechanism is the internal system of gears, springs, and regulators that converts stored or supplied energy into the precise, periodic movement of hands or indicators to measure and display time.
  • B. steam locomotive valve gear
    A steam locomotive valve gear is a mechanical linkage system that controls the admission and exhaust of steam in the cylinders to regulate the engine’s direction, power, and efficiency.
  • C. mechanical musical instrument
    A mechanical musical instrument is a device that produces music through physical mechanisms—such as gears, levers, bellows, or rotating cylinders—rather than electronic or purely manual performance.
  • D. classical mechanical system
    A classical mechanical system is a physical system whose motion and interactions are fully described by Newtonian mechanics (or equivalent formulations like Lagrangian or Hamiltonian mechanics) using deterministic laws for particles or rigid bodies in space and time.
  • E. mechanical puzzle
    A mechanical puzzle is a physical object designed with interlocking or movable parts that must be manipulated in specific ways to achieve a goal, such as assembly, disassembly, or transformation.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e288bc8f608190ac4af29f0bd1c744 completed April 17, 2026, 7:23 p.m.
Created at: April 17, 2026, 9:42 p.m.