Triple
T24007942
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Dhanush |
E594440
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | ship-launched ballistic missile |
C33692
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: ship-launched ballistic missile Context triple: [Dhanush, instanceOf, ship-launched ballistic missile]
-
A.
surface-to-ship missile
A surface-to-ship missile is a guided weapon launched from land, sea, or air platforms specifically designed to detect, track, and destroy naval surface vessels.
-
B.
ballistic missile
A ballistic missile is a guided projectile that is launched into a high, arching trajectory and primarily follows a ballistic path under gravity to deliver a warhead to a distant target.
-
C.
submarine-launched ballistic missile system
A submarine-launched ballistic missile system is a covert, sea-based strategic weapons platform that uses submarines to deploy and fire long-range ballistic missiles capable of delivering nuclear or conventional warheads.
-
D.
surface-to-surface missile
chosen
A surface-to-surface missile is a guided weapon launched from land or sea platforms designed to strike targets located on the Earth's surface.
-
E.
cruise missile
A cruise missile is a guided, self-propelled weapon that flies at low altitude along a pre-programmed path to deliver a precise payload to a distant target.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e288bc8f608190ac4af29f0bd1c744 |
completed | April 17, 2026, 7:23 p.m. |
Created at: April 17, 2026, 9:41 p.m.