Triple
T23993128
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | MIT course 2.70 |
E605119
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | design course |
C48765
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: design course Context triple: [MIT course 2.70, instanceOf, design course]
-
A.
design discipline
A design discipline is a specialized field of practice focused on systematically planning, shaping, and refining products, services, or experiences to meet functional needs and aesthetic, social, or strategic goals.
-
B.
design practice
Design practice is the systematic, iterative application of design methods, tools, and principles to solve problems, create meaningful experiences, and refine solutions in real-world contexts.
-
C.
design campus
A design campus is a dedicated educational and creative environment where students, faculty, and professionals collaborate across studios, labs, and shared spaces to explore, develop, and apply design thinking and practice.
-
D.
design institute
A design institute is an educational and research organization dedicated to teaching, exploring, and advancing principles and practices of design across various disciplines.
-
E.
design collaboration
Design collaboration is the process by which multiple stakeholders—such as designers, clients, developers, and users—work together iteratively to create, refine, and align on effective design solutions.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e295463f7c8190b1c19dbd114641b9 |
completed | April 17, 2026, 8:17 p.m. |
Created at: April 17, 2026, 9:37 p.m.