Triple

T23987223
Position Surface form Disambiguated ID Type / Status
Subject Lydda–Ramle–Jerusalem corridor E604970 entity
Predicate instanceOf P0 FINISHED
Object strategic land corridor C30467 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: strategic land corridor
Context triple: [Lydda–Ramle–Jerusalem corridor, instanceOf, strategic land corridor]
  • A. strategic military route chosen
    A strategic military route is a planned path or corridor used to move troops, equipment, and supplies efficiently while maximizing operational advantage and minimizing vulnerability to enemy action.
  • B. transport corridor
    A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
  • C. Indigenous travel corridor
    An Indigenous travel corridor is a traditional route or network of pathways used by Indigenous peoples for movement, trade, cultural exchange, and connection across their ancestral lands.
  • D. road transportation corridor
    A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
  • E. trade and transportation corridor initiative
    A trade and transportation corridor initiative is a coordinated program to develop and optimize key routes, infrastructure, and policies that facilitate efficient movement of goods and people across regions or borders.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e295463f7c8190b1c19dbd114641b9 completed April 17, 2026, 8:17 p.m.
Created at: April 17, 2026, 9:36 p.m.