Triple

T23952883
Position Surface form Disambiguated ID Type / Status
Subject Seven Summits of the Caucasus E603097 entity
Predicate instanceOf P0 FINISHED
Object Caucasus mountain challenge C22283 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Caucasus mountain challenge
Context triple: [Seven Summits of the Caucasus, instanceOf, Caucasus mountain challenge]
  • A. mountain pass
    A mountain pass is a navigable route through a mountain range or over a ridge that provides a lower and more accessible crossing point between valleys or regions.
  • B. serie de cumbres internacionales
    Una serie de cumbres internacionales es una secuencia organizada de reuniones diplomáticas periódicas entre representantes de distintos países o entidades internacionales para debatir y coordinar políticas sobre temas de interés común.
  • C. mountain
    A mountain is a large natural elevation of the Earth's surface rising prominently above its surroundings, typically with steep sides and a significant height relative to nearby terrain.
  • D. hiking challenge chosen
    A hiking challenge is an organized or self-set goal that involves completing specific hiking routes, distances, or elevation gains within a defined timeframe to test endurance, skill, and perseverance.
  • E. mountain complex
    A mountain complex is an interconnected system of multiple mountain ranges, peaks, valleys, and related geological features that function together as a larger mountainous region.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2953e4924819093f1c24c03476b42 completed April 17, 2026, 8:17 p.m.
Created at: April 17, 2026, 9:21 p.m.