Triple

T23944228
Position Surface form Disambiguated ID Type / Status
Subject NI India E602870 entity
Predicate instanceOf P0 FINISHED
Object engineering solutions provider C426 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: engineering solutions provider
Context triple: [NI India, instanceOf, engineering solutions provider]
  • A. engineering service
    An engineering service is a professional offering that applies scientific and technical expertise to design, analyze, develop, or maintain systems, structures, or processes to meet specific client or project needs.
  • B. professional services solutions provider
    A professional services solutions provider is an organization that delivers specialized expertise, advisory, and implementation services to help clients solve complex business challenges and achieve strategic objectives.
  • C. engineering firm chosen
    An engineering firm is a business organization that provides professional engineering services—such as design, analysis, consulting, and project management—to plan, develop, and implement technical solutions for clients in various industries.
  • D. provider of embedded computing solutions
    A provider of embedded computing solutions designs, develops, and supplies specialized hardware and software systems that integrate computing capabilities into products, devices, or industrial applications.
  • E. energy solutions company
    An energy solutions company designs, develops, and delivers technologies and services that provide efficient, reliable, and sustainable energy to residential, commercial, and industrial customers.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2953e4924819093f1c24c03476b42 completed April 17, 2026, 8:17 p.m.
Created at: April 17, 2026, 9:11 p.m.