Triple

T23931705
Position Surface form Disambiguated ID Type / Status
Subject Washington/Wabash station (CTA) E602515 entity
Predicate partOfLoop P69752 FINISHED
Object Loop Elevated NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Loop Elevated | Statement: [Washington/Wabash station (CTA), partOfLoop, Loop Elevated]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: partOfLoop
Context triple: [Washington/Wabash station (CTA), partOfLoop, Loop Elevated]
  • A. partOfLoopWith
    Indicates that one entity participates as a component or segment within the same loop structure as another entity.
  • B. partOfLoopElevated chosen
    Indicates that something forms an elevated segment within a looped structure or pathway.
  • C. isLoop
    Indicates that something forms or behaves as a closed, repeating cycle or path that returns to its starting point.
  • D. loopLocation
    Indicates the specific place or context in which a loop occurs or is situated.
  • E. partOfProcess
    Indicates that one event, step, or action occurs as a component or stage within a larger overall process.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2953b928c819095395fa87baca583 completed April 17, 2026, 8:16 p.m.
NER Named-entity recognition batch_69f1cf9c223881908e5fa4b5564848e6 completed April 29, 2026, 9:30 a.m.
PD Predicate disambiguation batch_69f16151ebdc819086e9e1d7cc1f4f3c completed April 29, 2026, 1:39 a.m.
Created at: April 17, 2026, 8:58 p.m.