Triple

T2389166
Position Surface form Disambiguated ID Type / Status
Subject STS-109 E48899 entity
Predicate followedBy P78 FINISHED
Object STS-110
STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
E282054 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-110 | Statement: [STS-109, followedBy, STS-110]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-110
Context triple: [STS-109, followedBy, STS-110]
  • A. STS-115
    STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
  • B. STS-121
    STS-121 was a 2006 NASA Space Shuttle Discovery mission focused on testing new safety improvements and resupply of the International Space Station as part of the post-Columbia "Return to Flight" efforts.
  • C. STS-120
    STS-120 was a 2007 Space Shuttle mission to the International Space Station that delivered the Harmony (Node 2) module and featured a dramatic solar array repair spacewalk.
  • D. STS-108
    STS-108 was a NASA Space Shuttle Endeavour mission in December 2001 that delivered supplies and a new crew to the International Space Station as part of the ISS assembly and logistics program.
  • E. STS-109
    STS-109 was a NASA Space Shuttle Columbia mission in 2002 that upgraded and refurbished the Hubble Space Telescope, significantly enhancing its scientific capabilities.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: STS-110
Triple: [STS-109, followedBy, STS-110]
Generated description
STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: STS-110
Target entity description: STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
  • A. STS-115
    STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
  • B. STS-121
    STS-121 was a 2006 NASA Space Shuttle Discovery mission focused on testing new safety improvements and resupply of the International Space Station as part of the post-Columbia "Return to Flight" efforts.
  • C. STS-120
    STS-120 was a 2007 Space Shuttle mission to the International Space Station that delivered the Harmony (Node 2) module and featured a dramatic solar array repair spacewalk.
  • D. STS-108
    STS-108 was a NASA Space Shuttle Endeavour mission in December 2001 that delivered supplies and a new crew to the International Space Station as part of the ISS assembly and logistics program.
  • E. STS-109
    STS-109 was a NASA Space Shuttle Columbia mission in 2002 that upgraded and refurbished the Hubble Space Telescope, significantly enhancing its scientific capabilities.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88aa5f63081908d07fd302029fcbd completed March 4, 2026, 7:40 p.m.
NER Named-entity recognition batch_69abc7dca9248190b634ae9e02f6899a completed March 7, 2026, 6:38 a.m.
NED1 Entity disambiguation (via context triple) batch_69af836559908190800f3be44aecd82f completed March 10, 2026, 2:35 a.m.
NEDg Description generation batch_69af858124908190b2c717aa1a44ee33 completed March 10, 2026, 2:44 a.m.
NED2 Entity disambiguation (via description) batch_69af86371b6c8190b17a7e57df9b4fb3 completed March 10, 2026, 2:47 a.m.
Created at: March 4, 2026, 7:57 p.m.