Triple
T2389166
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | STS-109 |
E48899
|
entity |
| Predicate | followedBy |
P78
|
FINISHED |
| Object |
STS-110
STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
|
E282054
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-110 | Statement: [STS-109, followedBy, STS-110]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: STS-110 Context triple: [STS-109, followedBy, STS-110]
-
A.
STS-115
STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
-
B.
STS-121
STS-121 was a 2006 NASA Space Shuttle Discovery mission focused on testing new safety improvements and resupply of the International Space Station as part of the post-Columbia "Return to Flight" efforts.
-
C.
STS-120
STS-120 was a 2007 Space Shuttle mission to the International Space Station that delivered the Harmony (Node 2) module and featured a dramatic solar array repair spacewalk.
-
D.
STS-108
STS-108 was a NASA Space Shuttle Endeavour mission in December 2001 that delivered supplies and a new crew to the International Space Station as part of the ISS assembly and logistics program.
-
E.
STS-109
STS-109 was a NASA Space Shuttle Columbia mission in 2002 that upgraded and refurbished the Hubble Space Telescope, significantly enhancing its scientific capabilities.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: STS-110 Triple: [STS-109, followedBy, STS-110]
Generated description
STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: STS-110 Target entity description: STS-110 was a 2002 Space Shuttle Atlantis mission to the International Space Station that delivered and installed the S0 truss segment, a key structural component of the station’s backbone.
-
A.
STS-115
STS-115 was a 2006 NASA Space Shuttle Atlantis mission that resumed International Space Station construction by delivering and installing a major truss segment and associated hardware.
-
B.
STS-121
STS-121 was a 2006 NASA Space Shuttle Discovery mission focused on testing new safety improvements and resupply of the International Space Station as part of the post-Columbia "Return to Flight" efforts.
-
C.
STS-120
STS-120 was a 2007 Space Shuttle mission to the International Space Station that delivered the Harmony (Node 2) module and featured a dramatic solar array repair spacewalk.
-
D.
STS-108
STS-108 was a NASA Space Shuttle Endeavour mission in December 2001 that delivered supplies and a new crew to the International Space Station as part of the ISS assembly and logistics program.
-
E.
STS-109
STS-109 was a NASA Space Shuttle Columbia mission in 2002 that upgraded and refurbished the Hubble Space Telescope, significantly enhancing its scientific capabilities.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a88aa5f63081908d07fd302029fcbd |
completed | March 4, 2026, 7:40 p.m. |
| NER | Named-entity recognition | batch_69abc7dca9248190b634ae9e02f6899a |
completed | March 7, 2026, 6:38 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69af836559908190800f3be44aecd82f |
completed | March 10, 2026, 2:35 a.m. |
| NEDg | Description generation | batch_69af858124908190b2c717aa1a44ee33 |
completed | March 10, 2026, 2:44 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69af86371b6c8190b17a7e57df9b4fb3 |
completed | March 10, 2026, 2:47 a.m. |
Created at: March 4, 2026, 7:57 p.m.