Triple

T23851670
Position Surface form Disambiguated ID Type / Status
Subject Royal Bank Cinema E592184 entity
Predicate instanceOf P0 FINISHED
Object film screening venue C565 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: film screening venue
Context triple: [Royal Bank Cinema, instanceOf, film screening venue]
  • A. film exhibition infrastructure project
    A film exhibition infrastructure project is a coordinated initiative to design, build, upgrade, or network physical and digital venues, technologies, and support systems that enable the public screening and distribution of films.
  • B. cinema chosen
    A cinema is a venue equipped with large screens, projection and sound systems, where audiences gather to watch films in a shared, theatrical setting.
  • C. cinema chain
    A cinema chain is a company that owns and operates multiple movie theaters under a unified brand, providing film screenings and related services across various locations.
  • D. film premiere event
    A film premiere event is a special, often high-profile screening that marks the first public or official showing of a movie, typically attended by the cast, crew, press, and invited guests.
  • E. film exhibition format
    A film exhibition format is a standardized method or medium (such as 35mm, IMAX, or digital projection) used to present motion pictures to an audience in theaters or other viewing environments.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e25d221d908190b9b502ad31e66a3f completed April 17, 2026, 4:17 p.m.
Created at: April 17, 2026, 8:11 p.m.