Triple

T23817682
Position Surface form Disambiguated ID Type / Status
Subject ECS E589139 entity
Predicate instanceOf P0 FINISHED
Object command and control center C32431 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: command and control center
Context triple: [ECS, instanceOf, command and control center]
  • A. command and control centre chosen
    A command and control centre is a centralized facility where information is collected, analyzed, and used to coordinate and direct operations, resources, and decision-making in real time.
  • B. command-and-control facility
    A command-and-control facility is a secure, centralized location equipped with communication, monitoring, and decision-support systems used to direct and coordinate operations and resources in real time.
  • C. command and control structure
    A command and control structure is an organizational framework that defines how authority, decision-making, and information flow are coordinated to direct and manage operations toward specific objectives.
  • D. military operations center
    A military operations center is a centralized facility where commanders and staff monitor, coordinate, and direct military activities and resources in real time.
  • E. deployable air command and control centre
    A deployable air command and control centre is a mobile, rapidly configurable facility that provides the infrastructure, systems, and personnel needed to plan, direct, and coordinate air operations in a given theater.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e25d18619081909c7fb89d8926f14a completed April 17, 2026, 4:17 p.m.
Created at: April 17, 2026, 7:58 p.m.