Triple

T23817252
Position Surface form Disambiguated ID Type / Status
Subject Nynäshamn–Gotland route E589128 entity
Predicate instanceOf P0 FINISHED
Object transport connection C48085 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transport connection
Context triple: [Nynäshamn–Gotland route, instanceOf, transport connection]
  • A. air transport connection
    An air transport connection is a scheduled or unscheduled linkage between two or more locations by aircraft, enabling the movement of passengers or cargo within an air transportation network.
  • B. transport connection grouping
    A transport connection grouping is a conceptual collection of related transport-layer connections that are managed or treated as a single logical unit for coordination, control, or analysis.
  • C. transport symbol
    A transport symbol is a standardized visual icon or sign that conveys information about transportation modes, routes, services, or regulations to facilitate safe and efficient travel.
  • D. transport strategy
    A transport strategy is a high-level plan that defines how people and goods will be moved efficiently, safely, sustainably, and cost-effectively within and between areas over a given time horizon.
  • E. transport terminal
    A transport terminal is a designated facility where passengers or goods begin, end, or transfer between different modes or routes of transportation.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e25d18619081909c7fb89d8926f14a completed April 17, 2026, 4:17 p.m.
Created at: April 17, 2026, 7:58 p.m.