Triple
T23805774
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Building B |
E589702
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | convention center hall |
C3167
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: convention center hall Context triple: [Building B, instanceOf, convention center hall]
-
A.
convention center
chosen
A convention center is a large, purpose-built facility designed to host conferences, trade shows, exhibitions, and other large-scale events, providing flexible meeting spaces and supporting services.
-
B.
conference center
A conference center is a large, purpose-built facility designed to host meetings, conventions, exhibitions, and other events, providing flexible spaces and supporting services for groups of various sizes.
-
C.
public meeting hall
A public meeting hall is a communal indoor space designed to host gatherings, events, and assemblies for members of the public or specific groups.
-
D.
convention center authority
A convention center authority is a governing or managing body responsible for the planning, operation, financing, and promotion of a convention center facility or system of facilities.
-
E.
ceremonial hall
A ceremonial hall is a large, formal space designed to host significant events, rituals, and gatherings such as weddings, graduations, and official ceremonies.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e25d19fecc8190a5cf39bbb18d5d7f |
completed | April 17, 2026, 4:17 p.m. |
Created at: April 17, 2026, 7:56 p.m.