Triple
T23764207
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | York Carriage Works |
E587331
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | rolling stock manufacturing facility |
C6408
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: rolling stock manufacturing facility Context triple: [York Carriage Works, instanceOf, rolling stock manufacturing facility]
-
A.
rolling stock manufacturer
chosen
A rolling stock manufacturer is a company that designs, builds, and often maintains railway vehicles such as locomotives, passenger coaches, and freight wagons.
-
B.
rolling stock storage facility
A rolling stock storage facility is a dedicated area or building where railway vehicles such as locomotives and carriages are parked, secured, and sometimes lightly serviced when not in operation.
-
C.
rolling stock maintenance company
A rolling stock maintenance company is an organization that inspects, services, repairs, and overhauls railway vehicles such as locomotives, passenger coaches, and freight wagons to ensure their safety, reliability, and regulatory compliance.
-
D.
rolling stock
Rolling stock refers to all the vehicles that move on a railway, including locomotives, passenger coaches, freight wagons, and maintenance units.
-
E.
rolling stock platform
A rolling stock platform is a standardized interface or framework that defines the common design, components, and systems used across a family of railway vehicles to streamline development, maintenance, and operation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e2490b8ac48190a6b35f1d5500486b |
completed | April 17, 2026, 2:51 p.m. |
Created at: April 17, 2026, 7:14 p.m.