Triple

T23755947
Position Surface form Disambiguated ID Type / Status
Subject International North–South Transport Corridor E587115 entity
Predicate instanceOf P0 FINISHED
Object international transport project C48020 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: international transport project
Context triple: [International North–South Transport Corridor, instanceOf, international transport project]
  • A. international railway
    An international railway is a rail transport system or route that connects and facilitates the movement of passengers and freight between two or more countries across their national borders.
  • B. international road
    An international road is a major transportation route that connects multiple countries, facilitating cross-border travel and trade by linking national road networks.
  • C. international port
    An international port is a major maritime facility equipped to handle the arrival, departure, and transfer of cargo and passengers between countries, integrating customs, logistics, and transportation infrastructure.
  • D. international movement
    An international movement is a coordinated, cross-border collective effort by individuals, groups, or organizations pursuing shared social, political, cultural, or economic goals on a global scale.
  • E. international air route
    An international air route is a designated flight path that connects airports in different countries, governed by bilateral or multilateral agreements and aviation regulations.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e2490a0eec81908cdef8a862828d7a completed April 17, 2026, 2:51 p.m.
Created at: April 17, 2026, 7:14 p.m.