Triple

T23723469
Position Surface form Disambiguated ID Type / Status
Subject Brown University school functions E586207 entity
Predicate instanceOf P0 FINISHED
Object campus activity C47988 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: campus activity
Context triple: [Brown University school functions, instanceOf, campus activity]
  • A. campus
    A campus is a defined area of land that houses the buildings, facilities, and open spaces of an educational institution, supporting academic, residential, and social activities.
  • B. campus axis
    A campus axis is a primary organizing line or pathway that structures the spatial layout, circulation, and visual relationships of buildings and open spaces across a campus.
  • C. extracurricular activity
    An extracurricular activity is a structured, voluntary pursuit outside regular academic coursework that supports personal, social, or skill development, such as clubs, sports, arts, or community service.
  • D. student festival event
    A student festival event is a planned gathering organized by and for students that combines entertainment, cultural or academic activities, and social interaction within an educational community.
  • E. university campus group
    A university campus group is an organized collection of students, faculty, or staff who share common interests, goals, or activities and operate within a university setting to foster community, learning, and engagement.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24906fb108190a6898751e46bdc11 completed April 17, 2026, 2:51 p.m.
Created at: April 17, 2026, 7:07 p.m.