Triple

T23711780
Position Surface form Disambiguated ID Type / Status
Subject Dome C E585884 entity
Predicate instanceOf P0 FINISHED
Object ice core drilling site C47976 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: ice core drilling site
Context triple: [Dome C, instanceOf, ice core drilling site]
  • A. ice core
    An ice core is a cylindrical sample drilled from ice sheets or glaciers that preserves layered records of past climate, atmospheric composition, and environmental conditions.
  • B. scientific drilling project
    A scientific drilling project is a coordinated research effort that uses specialized drilling techniques to recover subsurface samples and data in order to investigate geological, environmental, or planetary processes.
  • C. drifting polar research station
    A drifting polar research station is a mobile scientific facility built on sea ice or an ice shelf that moves with natural ice drift to enable continuous, in situ observation of polar environments and climate processes.
  • D. ice field
    An ice field is a vast, contiguous expanse of interconnected ice and snow, typically covering mountainous or polar regions and feeding multiple glaciers.
  • E. glacier
    A glacier is a massive, persistent body of dense ice that forms on land from accumulated snowfall and slowly flows under its own weight, reshaping the landscape over time.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69e24905f77881908194d645676acd60 completed April 17, 2026, 2:51 p.m.
Created at: April 17, 2026, 6:54 p.m.