Triple
T23696996
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bridge of Brodgar |
E585475
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | historic causeway |
C27653
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: historic causeway Context triple: [Bridge of Brodgar, instanceOf, historic causeway]
-
A.
historic road
A historic road is a transportation route of significant age and cultural, economic, or political importance, preserved or recognized for its role in shaping historical events, trade, or settlement patterns.
-
B.
ancient causeway
chosen
An ancient causeway is a raised, often stone-paved roadway or path constructed across low or wet ground, marshes, or water to connect important settlements, ceremonial sites, or trade routes in antiquity.
-
C.
historic infrastructure
Historic infrastructure comprises long-standing physical structures and systems—such as bridges, roads, canals, and railways—that were built in the past and continue to embody cultural, technological, and architectural significance.
-
D.
historic entrance
A historic entrance is a formally recognized point of access to a building or site that embodies significant architectural, cultural, or historical value from a particular period.
-
E.
historic gateway and bridge
A historic gateway and bridge is an architectural structure that combines a monumental entrance passage with a spanning construction over a physical obstacle, often serving both defensive and ceremonial functions while facilitating transit.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e24904bd508190abfcb74855de2918 |
completed | April 17, 2026, 2:51 p.m. |
Created at: April 17, 2026, 6:53 p.m.