Triple
T23684135
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | The Electromagnet and the Electrician |
E585115
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | technical work |
C46823
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: technical work Context triple: [The Electromagnet and the Electrician, instanceOf, technical work]
-
A.
technical code
Technical code is a structured set of machine-readable instructions, written in a specific programming language, that implements precise computational logic and system behavior according to defined technical requirements.
-
B.
technical role
A technical role is a position focused on applying specialized scientific, engineering, or technological expertise to design, build, maintain, or improve systems, products, or processes.
-
C.
technical personnel
Technical personnel are individuals with specialized knowledge and skills who install, operate, maintain, or support technical systems, equipment, or processes within an organization.
-
D.
technical branch
A technical branch is a specialized subdivision within an organization or field that focuses on a particular area of technical expertise, research, or application.
-
E.
technical text
chosen
A technical text is a written document that explains, instructs, or reports on specialized subjects using precise, domain-specific language intended for readers with some level of technical knowledge.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69e24901f7c08190909fd727632e823d |
completed | April 17, 2026, 2:51 p.m. |
Created at: April 17, 2026, 6:52 p.m.